Services

Rigging, erection and communications works.

Six streams of work, priced by scope and delivered with the lift plan, the licences and the inspection records that go with them.

Capability

What we deliver

Engage any single stream, or the whole sequence from steel on the ground to a dressed and tested structure.

Rigging and dogging crews

Licensed riggers and doggers supporting mobile and crawler crane operations on construction and industrial sites.

  • Load assessment and sling configuration
  • Shackle, chain and softener selection
  • Crane directions, tag lines and exclusion zones
  • Pick-and-carry and multi-crane lift support

Structural steel and precast erection

Setting, plumbing and securing structural members — columns, beams, portal frames, precast panels and platework.

  • Bolt-up, plumb and line adjustment
  • Temporary bracing and propping
  • Stair, mezzanine and walkway installation
  • Handover with torque and inspection records

Mast, tower and rooftop installation

Climbing works on monopoles, guyed masts, lattice towers and rooftop sites for telecommunications and broadcast structures.

  • Antenna, remote radio unit and mount installation
  • Headframe, ladder and platform works
  • Guy wire tensioning and adjustment
  • Structural mounting to rooftop and wall plant

Cable hauling and link alignment

Getting the signal path physically in place and pointed correctly, from the equipment shelter to the top of the structure.

  • Feeder, coaxial and fibre hauling and dressing
  • Cable tray, ladder rack and waveguide bridge works
  • Microwave dish mounting and alignment support
  • Earthing and bonding installation

Height safety and rope access

Reaching work that a platform cannot, and making sure the structure is safe for whoever climbs it next.

  • Rope access inspection and maintenance works
  • Anchor point and static line installation
  • Fall-arrest system inspection
  • Rescue planning and standby

Lift planning and documentation

The paperwork a principal contractor needs before a crane turns up, prepared by the people who will run the lift.

  • Lift studies and crane configuration checks
  • Safe work method statements and job safety analyses
  • Rigging gear inspection registers
  • Site-specific rescue plans
Engagement

How a job runs

This is a real sequence — each step produces something the next one depends on, and we do not skip forward when the schedule tightens.

  1. 01

    Scope and constraints

    You send the load, the height, the access and the dates. We ask about ground conditions, live plant, exclusion zones and who else is on site.

  2. 02

    Site assessment

    Where the job warrants it we attend before quoting. Crane standing, anchor availability and climb access are decided on the ground, not from a drawing.

  3. 03

    Plan and documentation

    Lift study, safe work method statement, gear list and rescue plan issued to you for review, with the licences of the crew attached.

  4. 04

    Execution

    Pre-start, gear inspection, zone set up, and the work performed under a named supervisor with authority to stop it at any point.

  5. 05

    Handover

    Site left clear, records issued — inspections, torque and tension sheets, as-installed notes and any defects we found and did not cause.

Diagram of a crane set up beside a structure, showing the standing area, the exclusion zone and the lift path STANDING EXCLUSION ZONE LIFT PATH
Standing, path and zone agreed before the pick
Where we work

Sectors and site types

The method changes with the site. These are the environments our scopes are written for.

  • Commercial construction
  • Industrial and processing plant
  • Telecommunications tower sites
  • Rooftop and in-building sites
  • Broadcast structures
  • Greenfield civil works
  • Shutdown and maintenance
  • Regional Western Australia
Registered particulars

An Australian-registered contractor

Legal entity
Superior Rigging & Comms Pty Ltd
ABN
89 699 958 177
ACN
699 958 177
Registered state
Western Australia 6031
Next step

Tell us what has to go up.

Send the scope, the site and the dates. We will come back with the method and what it will take.